Open concept floor plan (attached) New floor (2024), New Fridge (2024) & New Paint (2024). 9Ft Ceilings, Floor To Ceiling Windows, Open Concept Kitchen Minutes To Financial District, St Lawrence Market, Subway/Ttc/Path System…
Open concept floor plan (attached) New floor (2024), New Fridge (2024) & New Paint (2024). 9Ft Ceilings, Floor To Ceiling Windows, Open Conc…